The Milnes Companies is currently nearing project completion for its work at United Water in New York. The design/build scope of work for the upgrade at the well site generally consists of two main construction activities: the addition of de-aeration equipment in a small structural add-on to the existing well house and increasing the diameter of an underground section of existing water main to serve as a chlorine contact vessel just to the east of the well house.

There are four new membrane de-aerators, one small vacuum pump, and one cartridge pre-filter housed within the 208 square foot building addition along with the necessary piping, valves, electric and controls. An eighty foot section of the existing 8” diameter underground water main was replaced with new 36” diameter pipe to provide additional contact chlorination time.

Want more updates on this United Water project? Head over to our Facebook page for news updates on our projects. Click here!

IMG_0352

Leave a comment

12 Frear Hill RoadTunkhannock, PA 18657

© 2022 Milnes Companies. All rights reserved.

© 2022 Milnes Companies. All rights reserved.