Project Name:
Williams Midstream Energy Perry Site and Meter Station

Project Manager:
Mick Goodwin

MEI Role:
Design and Construction Engineer

Location:
Dallas Twp, Wyoming County Pa

Market:
Energy

Project Start Date:
October 2010

Project Complete Date:
December 2012

Owner:
Williams Field Services Company, LLC

Description:

Milnes Engineering assisted Williams Field Services Company, LLC in the development of two (2) natural gas meter sites located along an approximately 33-mile pipeline from Springville, PA to Dallas, PA. One of those sites is in Dallas Township, Wyoming County, PA, and is commonly referred to as the Perry Site.

MEI was responsible for the land development planning and permitting (including zoning approvals), as well as assisting Williams during the construction phase to complete this project. MEI services included civil survey, preparation of subdivision and site development drawings, driveway permitting, stormwater design and general consulting during the design and construction phases. MEI was provided information related to wetland and intermittent stream delineation, and used consultant services for soil infiltration testing. ESCGP-1 permitting for this site was included in the permitting for the entire pipeline corridor, and was coordinated with other consultants.

Leave a comment

12 Frear Hill RoadTunkhannock, PA 18657

© 2019 Milnes Companies. All rights reserved.

© 2019 Milnes Companies. All rights reserved.